🌟 More than 80 Projects across 9 States in 2024 🌟

Commercial & Industrial Projects

40.6 kWp – Iskandar Puteri, Johor
82.8 kWp – Johor Bahru, Johor
245 kWp – Masai, Johor
67.8 kWp – Johor Bahru, Johor

12.4 kWp – Wangsa Maju, Kuala Lumpur

94.4 kWp – Ulu Tiram, Johor

43.7 kWp – Sri Damansara, Kuala Lumpur
24.2 kWp – Johor Bahru, Johor
76.2 kWp – Johor Bahru, Johor
48.4 kWp – Johor Bahru, Johor

36 kWp – Iskandar Puteri, Johor

106.6 kWp – Johor Bahru, Johor

360.6 kWp – Seberang Perai, Penang

1,495 kWp – Shah Alam, Selangor

500 kWp – Gelang Patah, Johor

106.95 kWp – Plentong, Johor
429.5kWp – across Peninsular Malaysia
94.4 kWp – Ulu Tiram, Johor

Residential Projects

14.95 kWp – Nusajaya, Johor Bahru
16.5 kWp – Johor Bahru, Johor
12.66 kWp – Subang Jaya, Selangor
16.24 kWp – Johor Bahru, Johor
16.52 kWp – Bertam Malim, Melaka
13.42 kWp – Johor Bahru, Johor
19.0 kWp – Ipoh, Perak
12.1 kWp – Petaling Jaya, Selangor